THE COMPANY
 

OUR HISTORY

After participating in several chemical plant projects and being in charge of the engineering department of an important multinational laboratory, we began in 1994 to provide external services in pharmaceutical facilities.

MERACKI ARQUITECTURA-OFICINA CANGALLO-PH_FEDERICO_KULEKDJIAN-04.jpg

Our company, known since 1998 as TECNO INGENIERIA, has incorporated a large team of professionals specialized in each area and has maintained an exclusive dedication to the pharmaceutical industry, in carrying out designs, projects, assembly and construction of classified areas, controlled areas, productive sectors and pharmaceutical plants. This exclusive dedication, plus the valuable contribution of the constant updating and training of our technical team, has allowed us to successfully face and solve projects of varying complexity in the "main service" of all medical laboratories, HVAC systems. Since our beginnings, providing concrete solutions in the areas of pharmaceutical air conditioning, HVAC ventilation and air treatment systems and DDC digital direct control systems, we have been gaining the trust of our customers. We develop our projects taking into account all the intervening aspects, based on the "sensitivity" and "potentiality" of the product and avoiding the possibility of cross contamination. This is how we define: necessary classification degrees, hourly renewals, product protection, environmental protection, operator protection, pressure cascade, air transfers, filtration and efficiency stages, design and characteristics of air treatment units (AUT), duct systems and all necessary equipment. In our work, from the design and project stages to construction and commissioning, we involve all the Complementary Services that are directly related to HVAC systems, such as localized extraction systems and dust collectors, mechanical ventilation for gases or vapors. , controlled humidity systems and ice water services (Chiller), heated water, steam, electrical systems and their generation. Over the years and in order to offer comprehensive solutions for the needs of pharmaceutical laboratories, we have incorporated into our projects the general services of pharmaceutical plants and plant utilities. By virtue of the technological and regulatory advances at a national and international level, we have the experience, support and appropriate technology for the efficient realization of projects of various sizes, also adapting the needs of each laboratory to the latest requirements of ISO, FDA, EMEA. , OMS and CGMP recommendations. Since our inception, we have been members of ISPE (International Society for Pharmaceutical Engineering) and ASHRAE (American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc.). Quality, speed of execution and economy are the keys to our operating philosophy, based on a strong concept of responsibility and sincerity. ​ Currently we are affected by the realization of new and innovative pharmaceutical and biotechnological projects, in addition to providing technical support to numerous laboratories.

Our Journey

Asofarma
Bago

FOODS

FRAY BENTOS

(Uruguay)

ALIMENTOS FRAY BENTOS.png

Milk Production Plant - Fray Bentos, ROU (2013-2017)

Project and Execution of Thermomechanical Work of the HVAC Air Conditioning, Mechanical Ventilation and Extraction Systems for the Milk Production Plant in Fray Bentos, Uruguay.

LAB.

BERNABO S.A.

laboratorios_bernabo_edited.png

Solid Production Plant (2014-2015)

Project and Execution of HVAC Installations for Air Conditioning, Mechanical Ventilation and Extractions, Localized Extraction Systems and Dust Collectors, DDC Digital Direct Control Systems, Central Supervision and Monitoring, Electrical Systems, General Plant Services, Industrial Steam systems, Water Ice Cold and Hot Water for HVAC. Surface approx. 9,000 m2.

JOHNSON &

JOHNSON

from Argentina S.A.

johnson_edited.jpg

Sanitary Protection Plant - SanPro (2014 / 2017)

Project and execution of HVAC Air Conditioning Systems, Mechanical Ventilation and DDC Control Systems, of operational sectors in production halls.

Liquid Elaboration Plant (2014-2015)

Project for a new building for the Production of Liquids (Oils,
Shampoo, Colonies) in Pilar Plant. Air Conditioning Systems HVAC, Ventilation

Starch Plant (2013-2014)

Project and execution of HVAC Air Conditioning Systems.

LABORATORIES

ROEMMERS

SAICF

2792162846de6b4f294db054e8ccbaae.jpeg

Fractionation Plant, Pharma 2000 (2013)

Execution of Controlled Humidity Fractionation Plant, for Pharma 2000 Plant (Slaughterhouses). ISO 7, 8 and CNC class areas (Classes C, D and E).

Liquid Plant, Luis Guillón (2012)

Project of Reform and Adaptation of the HVAC Systems for the Plant of Elaboration and Filling of Liquids, Secondary Packaging and Warehouses.

Sampling plant, Luis Guillón (2009)

Project and Execution of Controlled Humidity Sampling Plant, for Sampling Sector, Changing Rooms, Air-locks, Office and Technical Areas.

(2009 to 2012)

Comprehensive Preventive Maintenance service for Plant systems, HVAC equipment and facilities, dust extraction, ice water, according to pre-established programs and procedures.

LABORATORIES

ZELLTEK SA

(Province of Santa Fe)

zeltek ind.png

Biotechnological Production Plant for Cell Culture
(2007-2009 / 2019-2021)

Project and execution of the HVAC Air Conditioning, Mechanical Ventilation and Special Extraction Systems, DDC Control Systems and EBI Supervision, Electrical Systems and General Plant Services (clean steam, steam boiler, softened water systems, WFI Plant, equipment of RO+EDI, generator and WFI Loop,
clean steam, special gases - O2, N2, CO2 - pharmaceutical compressed air, etc. Surface Approx. 3,600m2.

SA THE SIBBIL

(Nogoyá - Province of Entre Ríos)

purisima.png

Milk Fractionation, Production and Filling Plant (2013)

By contract of Lab. ROEMMERS SAICF.
Project and Execution of Powdered Milk Production Plant
for maternal and child consumption. ISO 7, 8 and CNC class areas (Classes C, D and E).

EUROFARMA

ARGENTINE S.A.

EUROFARMA ARGENTINA S.png

Central Heavy Plant (2018)

Execution of HVAC Thermomechanical Ventilation and Air Conditioning Systems for the Sealing area. Provision and installation of laminar flows for the Autoclave Unloading, Bottle Washing and Sealing areas.

ZOETIS INDUSTRY

OF PRODUCTS

(Brazil)

zoetis_.png

Mobile Laminar Flows (2018-2019)

Design and construction of six (6) Mobile Laminar Flows of Autonomous operation, for the transport of sterile substances and/or elements within productive areas.

LABORATORIES

BIOGENESIS BAGO

Biogenesis bago.png

Biosafety Area Expansion (2020-2021)

Execution of the HVAC System Engineering Project for air conditioning, ventilation and services for the Vaccine Production Plant against Foot-and-Mouth Disease. Surface approx. 750m2.

MICROSULES

Argentina

MICROSULES Argentina S.A. de S.C.I.png

Quality Control and Microbiological Laboratories (2017)

Execution of the HVAC Air Conditioning Systems, for the Quality Control and Microbiological Laboratories. Surface approx. 230m2.

KLOCKNER

PENTAPLAST

(Villa del Totoral – Córdoba)

KLÖCKNER PENTAPLAST.png

Laminating plant for pharmaceutical packaging (2020)

Execution of HVAC Thermomechanical Ventilation and Air Conditioning Systems for the L43 Rolling Mill area. Surface approx. 360 m2,

LABORATORIES ASOFARMA SAI and C.

asofarma.png

Solids Plant Stage 1 and 2 (2018-2021)

Execution of HVAC Thermomechanical Ventilation and Air Conditioning Systems for Fractioning, Granulating, Mixing, Drying, Sampling, Primary and Secondary Conditioning, Laundry, Compression and Capsule Areas. Surface approx. 350 m2.

LABORATORIES

IMA

Laboratorios ima.png

Sterile Oncological Lyophilized Plant (2020)

Execution of HVAC Thermomechanical Ventilation and Air Conditioning Systems for the Sealing area. Provision and installation of laminar flows for the Autoclave Unloading, Bottle Washing and Sealing areas.

Mobile Laminar Flows (2020)

Design and construction of two (2) Mobile Laminar Flows of Autonomous operation, for the transport of sterile substances and/or elements within productive areas.

GEMA Biotech S.A.

(Pilot Plant of

Biotechnology)

GEMA.png

Reforms HVAC Systems (2011-2012 / 2019)

Reform of HVAC air conditioning and ventilation systems, DDC Control Systems and Electrical Systems for Microbiology and QC Laboratories, adaptation for new lay-out, new Freeze-dried Area, Clean Tank Deposit, Cold Room and Autoclave Room. ISO 7 and ISO 8 class areas.

Biotechnology Pilot Plant, Stages I and II and III (2005-2007)

“Turnkey” project and execution of the Biotechnology and Cell Culture Pilot Plant, on the 5th floor of  ROEMMERS SACIF building, Olivos Plant. Class 10,000 and 100,000 areas (ISO 7 and 8 - Clase  C and D) and CNC environments.
Architecture and General Plant Services. Surface 1,000 m2.

(2005 to 2010)

Comprehensive Preventive Maintenance service for Plant systems and utilities, HVAC equipment and installations, dust extraction, chilled water, softened water, clean steam, cooled and heated process water, special gases - O2, N2, CO2, He - air clean tablet, etc., according to pre-established programs and procedures.

ERIOCHEM S.A.

(Province of Entre Ríos)

ERIOCHEM S.png

Oncological Lyophilized Plant (2013-2015 / 2017)

Execution of Lyophilized Oncological Products Plant. Productive area 300 m2. Execution of expansion of the productive area of the pharmaceutical Line B, incorporation of a new preparation area and sterile area.

SZ Plant Project (Science Park - ROU) (2014)

Conceptual Design, Basic Project and Definitive Project.

Mobile Laminar Flows (2013)

Design and construction of two (2) Mobile Laminar Flows of Autonomous operation, for the transport of semi-finished sterile products.

Microcapsule Plant (2004)

Execution of the Basic Project and complementary details of the HVAC air treatment systems. Class 100 and 10,000 areas (ISO5 and 7 - Classes A and C).

Sterile Area (2003)

Project and installation of the air treatment system and renovation of the sterile area with a laminar flow ceiling. Class 100 and 10,000 areas (ISO 5 and 7 - Classes A and C)

GIVAUDAN

Argentina S.A.

GIVAUDAN Argentina S.png

Creations and Applications Laboratory - Stage II (2017)

Plant Execution of HVAC Air Conditioning Systems, Mechanical Ventilation and extraction in the Kitchen, Circulation, Laboratories and Test sectors.

MSD Spray Drying Plant (2013)

Execution of Production Plant and Drying of aromatic products by Torres Spray in Munro Plant, Province of Buenos Aires. Areas class ISO 8 and CNC (Classes D and E).

LABORATORIES

POEN SACIFI

POEN.png

Ophthalmic Plant, Plant Profits (1997-1998)

Project and integral execution of plant services. Air conditioning systems, dust extraction and separation, cold and hot water, industrial steam, electrical installation, compressed air, generation and distribution of purified water PW (USP 23) and pure steam, special gases (O2, N2), etc.

(1998-2004)

Comprehensive Preventive Maintenance service for HVAC systems, extractions and Plant Services, according to pre-established programs and procedures.

LABORATORY

BIOSIDUS S.A.

LABORATORIO BIOSIDUS S.png

Fractionation – Bernal Plant (2017)

Project of HVAC Air Conditioning Systems and DDC Control Systems.

LABORATORIOS SANDOZ S.png

LABORATORIES

SANDOZ S.A.

Plant I: Solids (1997)

Project and execution of HVAC Air Conditioning Systems, Mechanical Ventilation, extraction and separation of dust and injection treatment systems and air extraction to pans.

Toxic Elaboration Area (1999)

Project and execution of the localized extraction system for filtration and adsorption of toxic and explosive gases and vapors from the manufacturing and filling area.

Plant II: Oncology (2005)

Project and execution of the general reform of Plant II, in compliance with the requirements (URS) of Novartis Pharmaceutical Division.

Mobile Laminar Flows (2006-2011)

Design and construction of operating Mobile Laminar Flows

(1998 to present)

Comprehensive Preventive Maintenance service for HVAC equipment and facilities, mechanical ventilation, dust extraction, ice water, hot water and steam
Plant I (Solids) and Plant II (Oncology), according to pre-established programs and procedures.

LABORATORY

VARIFARMA S.A.

LABORATORIO VARIFARMA S.png

Sterile Area of Freeze-dried Products (2015)

Project and execution of HVAC Air Conditioning Systems and DDC Control Systems. ISO Areas 5 and 7 (Class B and C).

Injectables Stage I and II (2016-2017)

Execution of HVAC Air Conditioning Systems and DDC Control Systems. Classes A and B.

LABORATORIO UNIFARMA.png

LABORATORY

UNIFARMA

(2013 to Present)

Comprehensive Preventive and Corrective Maintenance service for HVAC equipment and facilities, dust extraction, Rooftop comfort equipment according to pre-established programs and procedures.

LABORATORIES

GRAMON S.A.

gramon.png

Semisolids (2013)

Project and execution of HVAC Air Conditioning Systems, Mechanical Ventilation and extraction and DDC Control Systems. Class D (ISO 8) areas.

Sterile Liquids (2013)

Project and execution of HVAC Air Conditioning Systems, Mechanical ventilation and extraction and DDC Control Systems. Class C and D areas (ISO 7 and 8).

Sterile Area (2013-2014)

Project and execution of HVAC Air Conditioning Systems, Mechanical Ventilation and extraction and DDC Control Systems. Class B and C areas (ISO 5 and 7).

LABORATORY

NOVARTIS

LABORATORIO NOVARTIS.png

(2013-2016)

Comprehensive Preventive and Corrective Maintenance Service for Plant Systems and utilities, HVAC equipment and facilities, dust extraction, ice water, steam
industrial, Rooftop comfort equipment according to pre-established programs and procedures.

(2013-2016)

Comprehensive Preventive and Corrective Maintenance Service for the Novartis / Sandoz Laboratory Building and General Service for ventilation, extraction and Rooftop comfort equipment according to pre-established programs and procedures.

LABORATORY

DUNCAN

LABORATORIO DUNCAN.png

(2010 to Present)

Comprehensive Preventive and Corrective Maintenance service for HVAC equipment and facilities, dust extraction, Rooftop comfort equipment according to pre-established programs and procedures.

MEGA-PHARMA S.A.

(Montevideo - Uruguay)

MEGA-Pharma S.png

Biotechnology Plant (2004-2005)

Project of the HVAC systems for air treatment and General Services of the Biotechnology and Cell Culture Plant, Biocontamination Level BL3-LS. Class 10,000 and 100,000 areas (ISO 7 and 8 - Classes C and D) and CNC environments. Analysis of requirements for process equipment.

Specifications Manual (2005)

Development and execution of the Technical Specifications Manual for the construction and/or remodeling of Pharmaceutical Plants, Architecture, HVAC Installations and Plant Utilities, to be used as a basis for future projects in the Mega-Pharma Group Production Plants.

KEMEX

S.A. Laboratories

kemtex lab.png

Oncology Lyophilized Plant (2006)

Project of the HVAC systems for air treatment, mechanical ventilation and complementary General Services, of the Plant for the elaboration and dosing of oncological freeze-dried products. ISO 5 laminar flow areas and ISO 7 premises (Classes A, B and C).

Oncological Lyophilized Plant (2007)

Construction and assembly of a new plant. Productive area 350 m2

LABORATORIOS FADA Pharma S.png

LABORATORIES

FADA

Pharma S.A.

(Quirón Project - Pilar Industrial Park)

Oncology Plant (2010-2011)

Execution of HVAC systems for air conditioning and mechanical ventilation and Extractions, localized extraction systems and Dust Collectors, Syst. Controlled Humidity (Dehumidifiers), DDC Control Systems, Supervision and

Central monitoring, Electrical Systems for the Plant of Oncological Products in its Solid, Liquid and Lyophilized forms.
Design, supply and assembly of Laminar Flow integrated into the Freeze-dried Liquid filling sector, linked to the HVAC system. ISO Area 5 (Class A).
Production area 3,000 m2.

Jhonson
Roemmers
Zelltek
ERICHEM
IMA
Klockner
ALIMENTOS FRAY
Microsules
BIOSUD
POEN
GIVAUDAN
GRAMON
NOVARTIS
Mega pharma
BERNABO
PURISIMA
EUROFARMA
ZOETIS
FADA
GEMA
VARIFARMA
SANDOZ
UNIFARMA
DUNCAN
Kemex

PHARMACEUTICAL

PARAGUAYA S.A.

(Asuncion, Paraguay)

FARMACEUTICA PARAGUAYA S.png

Sterile Area, Non-Oncological Injectables (2004)

Execution of the Project of the HVAC systems for air treatment and complementary General Services, of the Plant for the preparation and filling of Sterile Liquids (first floor).

QC and Microbiology Laboratories (2004)

Execution of the General Architecture Project, HVAC air treatment systems and General Services, of the Microbiology, Physical-Chemical, Instruments and complementary areas Laboratories (ground floor). Class 100, 10,000 and 100,000 areas
(ISO 5, 7 and 8 - Classes A, C and D) and CNC environments.

CARDINAL HEALTH

Argentina 400 SAIC

(RP Scherer Argentina)

CARDINAL HEALTH Argentina 400 S.A.png

Plants Softgels and Pharmacy (2001)

Adaptation, regulation and fine-tuning of the Munters dehumidifier equipment with continuous cycle by Silica-gel, with electric and natural gas reactivation.

(2001 to 2010)

Comprehensive Preventive Maintenance service for Munters Plant Dehumidifier systems and equipment, according to pre-established programs and procedures.

Farmacutica para
Cardinal

LABORATORIES

NORTHIA S.A.(Liniers Plant)

LABORATORIOS NORTHIA S.png

Penicillanic plant (2001)

Project and execution of the air conditioning and mechanical ventilation systems of the Penicilánicos Plant. Sterile Area class 10,000 (ISO 7 - Class C) and class 100,000 (ISO 8 - Class D).

Betalactam Powder and Syrup Plant (2001-2003)

Design and execution of the air conditioning, mechanical ventilation and dust extraction systems of the Betalactam Plant. Clean Areas class 100,000 (ISO 8 - Class D).

Preparation Area (2001)

Project and execution of the air conditioning and mechanical ventilation systems in the Preparation Area. Clean Area class 100,000 (ISO 8 - Class D) and unclassified areas.

Injectable Sterile Area (2004)

Project and execution of the air conditioning systems in the Injection Preparation area. Class 10,000 Sterile Areas (ISO 7 - Class C).

Wash Areas (2004)

Project and execution of the air conditioning and mechanical ventilation systems of the Third Floor Laundry Areas. Clean Area class 100,000 (ISO 8 - Class D).

Sterile Powder Filling Area (2006)

Remodeling of the area, with relocation of terminal modules, replacement of the Air Handling Unit and conditioning systems. Class 10,000 Sterile Area (ISO 7 - Class C).

Sterile Liquid Filling Area (2006)

Remodeling of the area, with relocation of terminal modules, replacement of the Air Handling Unit and conditioning systems. Class 10,000 Sterile Area (ISO 7 - Class C).

Sterile Areas for Liquids and Injectables (2007)

Remodeling of the sterile areas for the Preparation and Filling of Injectables, with provision, replacement and relocation of new Air Handling Units, terminal modules, duct systems and conditioning systems. Class 10,000 Sterile Areas (ISO 7 - Class C).

Injectable Sterile Area (2011)

(2001 to 2010)

Remodeling of the sterile areas for Ampoule Washing and Injection Filling, with provision, replacement, and relocation of new Air Handling Units, terminal modules, duct systems, and conditioning systems. Sterile Areas class ISO 5, 7 and 8 (Class A, B, C and D).

Comprehensive Preventive Maintenance service for HVAC equipment and facilities, mechanical ventilation, dust extraction, cold and hot water, and plant steam, according to pre-established programs and procedures.

northia

LABORATORIES

KLONAL S.R.L.

LABORATORIOS KLONAL S.png

Sterile Liquids Plant (2001)

Design and execution of the air conditioning, mechanical ventilation and dust extraction systems for the Sterile Liquids processing and filling plant (Ground Floor). Clean Areas class 10,000 (ISO 7 - Class C), class 100,000 (ISO 8 - Class D), Warehouses and Social.

Betalactam Solids and Syrups Plant (2001-2002)

Design and execution of air conditioning systems with controlled humidity, dehumidifying equipment and systems, mechanical ventilation and dust extraction systems for the Betalactam Powder and Syrup Plants (First Floor). Clean Areas class 10,000 (ISO 7 - Class C) and class 100,000 (ISO 8 - Class D).

Non Betalactam Solids Plant (2002)

Project and execution of the air conditioning systems, mechanical ventilation and dust extraction system of the Non-Beta-lactam Solids Plants. Clean Areas class 100,000 (ISO 8 - Class D).

Non-Beta-lactam Weighing and Sampling Areas (2003)

Design and execution of the air conditioning systems, mechanical ventilation and dust extraction system for the sectors of Heavy and Non-Beta-lactam Drug Sampling. Areas  Clean class 100,000 (ISO 8 - Class D).

LABORATORIES

FABRA S.R.L.

LABORATORIOS FABRA S.png

Solids Sterile Area, Plant C. Gardel (1997)

Project and installation of the air conditioning system. Area
clean class 10,000 (ISO 7 - Class C).

Sterile Area for Injectable Solids and Liquids, Plant C. GardeL (1999)

Project and remodeling of the clean area class 10,000 (ISO 7 - Class C) of Injectables. Execution of civil works and improvement of the HVAC system of the Liquids sector.

Conditioning Area, Plant C. Villate (2000)

Project and installation of the air conditioning system. Commissioning and regulation of the facilities.

Controlled Humidity System, Sterile Solids Area
Cytostatics, Plant C. Villate (2001)

Project and installation of the controlled humidity system, Continuous Dehumidifier equipment and treatment units for the clean area class 100,000 (ISO 8 - Class D) of solids. Expansion and adaptation of the chilled water system.

klonal
fabra

G&M S.A.

(ELEA Laboratory

SACIF and A.)

G & M S.png

Solids Manufacturing Plant (2003)

Project and installation of the controlled humidity system for the existing HVAC system of the Solids Manufacturing area, chilled water system, Fisair Dehumidifier equipment and air treatment units. Class 100,000 areas (ISO 8 - Class D). Commissioning and regulation of the facilities.

LABORATORIES

AVENTIS PASTEUR

S.A. (American Rhein)

LABORATORIOS AVENTIS PASTEUR S.png

Fermentation Plant (2000)

Advice and technical support for the "Scarling-up" and re-equipment in the sterile fermentation area, with respect to the facilities and plant utilities.

Remodeling Sterile Area (2001)

Project and execution of the modifications of the premises of the sterile area, installations of

General services. Incorporation of the localized dust extraction system to the system

HVAC. Analysis of requirements for process equipment.

G y m
Aventins

LABORATORIES

SERONO ARES

International Inc.

LABORATORIOS ARES SERONO Internacional.png

Cytostatic Plant (1999)

Advice and technical support for the Commissioning and
Regulation of HVAC air conditioning system and heating system
DDC control of the new Lyophilization Plant. clean areas classes
100 (ISO 5 - Class A), 10,000 (ISO 7 - Class C) and 100,000 (ISO 8 - Class
D). Documentation study and certification tests.

Serono